FAQ

What is 8664?

8664 is a plan to remove Interstate 64 from Louisville's waterfront. "86" is slang that means to remove or get rid of something. The idea is to realign I-64 onto I-265 in KY and IN after an upriver bridge is completed. This will redirect cross-country traffic (mainly trucks) around the city and improve access to and from downtown. It will also allow us to tear down the waterfront expressway from I-65 to west 15th Street. The 8664 vision should improve downtown and be less expensive than the planned Ohio River Bridges Project.

What is the Ohio River Bridges Project?

The planned Ohio River Bridges Project is a massive $4.1 Billion road-building project that will build two bridges and triple the size of Spaghetti Junction. How will it affect downtown? I-64 across Waterfront Park will get 50% wider and Spaghetti Junction will expand to 23 lanes wide. The result will be more noise, traffic and air pollution. Additionally, the huge expansion in roads will cause "induced traffic" that will fuel eastward sprawl development and reduced investment in downtown.

Why remove the waterfront expressway?

Louisville is here because of the Ohio River. When we built an expressway between the city and the Ohio River, we cut off our connection to our past and our greatest natural resources. Waterfront Park is a good example of the positive impact our waterfront can have on our city, but it's time to take the next step. San Francisco, Portland and Milwaukee have all removed waterfront expressways and seen dramatic increases in urban investment and improved livability. It's time for everyone - on both sides of the river - to come together around an exciting vision for the future of our community.

Where will all the traffic go?

Our regional transportation system will have many years to adapt to the removal of the Waterfront Expressway. When I-64 is realigned onto I-265, it will serve as a bypass for interstate traffic. An "at-grade" or ground-level boulevard - similar to River Road - will provide access to and through downtown from the east and west ends. Removing capacity across our waterfront will also naturally spread traffic over the larger urban street grid. The benefit of this redistribution will be improved vibrancy and economic investment in under-used or under-served areas of downtown. A comprehensive traffic study should be conducted to evaluate the 8664 plan. 

To lend your support to 8664, go to Donate and/or Take Action.

Sign up today!

Do you support 8664?
Name
Email
Zip

Be Social